7/9/2019 | 1 MINUTE READ

Hot Runner System Comes Fully Equipped

Facebook Share Icon LinkedIn Share Icon Twitter Share Icon Share by EMail icon Print Icon

Hasco’s Hot Half H4400/… system comes fully equipped with all the hot runner components and nozzles, as well as the clamping, bolster and nozzle retainer plates, plus the standard components and connectors, and is ready for immediate use.

Hasco’s Hot Half H4400/… system comes fully equipped with all the hot runner components and nozzles, as well as the clamping, bolster and nozzle retainer plates, plus the standard components and connectors, and is ready for immediate use.

In addition to checking the mold-specific dimensions, all the drive and connection components are tested to ensure proper functioning. All the test results, documented in corresponding test reports, are included in the delivery. The Hot Halves are equipped with a USB 2.0 data storage device which contains all the available information, such as drawings, parts lists and measurement protocols. Regardless of where the mold is used, the data can be called up directly from the system. As an information storage device to accompany the mold, the screw memory A5805 can be used to archive all the mold and/or article-specific data directly in the mold. It can then be read out at any time without any need for a data cable.

Labels for connector assignment are permanently affixed with slotted pins, and a system-specific nameplate based on the A6500/… is supplied with each Hot Half. The white-coated aluminum nameplate is individually printed with the system and customer-relevant data and covered with magnetic film. The two available sizes can be positioned either directly on the Hot Half or at a clearly visible point on the injection molding machine.

The Hot Half enables moldmakers and injection molders to considerably shorten design and production times for hot runner molds. Through its finely tuned assembly of the nozzles and its precise alignment of all the parts, the company ensures a leak-free system with functioning components.

The Hot Half is delivered within three to six weeks, depending on complexity. HASCO hot runner advisers and application technicians are available to assist customers worldwide and to configure an individual Hot Half in the optimum manner for the required application.

Hand holding a crystal ball

We’d rather send you $15 than rely on our crystal ball…

It’s Capital Spending Survey season and the manufacturing industry is counting on you to participate! Odds are that you received our 5-minute Metalworking / Plastics survey from MoldMaking Technology in your mail or email. Fill it out and we’ll email you $15 to exchange for your choice of gift card or charitable donation. Are you in the U.S. and not sure you received the survey? Contact us to access it.

Help us inform the industry and everybody benefits.

RELATED CONTENT

  • A Different Approach to Mold Venting

    Alternative venting valves can help overcome standard mold venting limitations and improve mold performance.

  • Staying Competitive Using Mold Flow Analysis

    The pressure on the supply chain is unrelenting for all things faster, better and cheaper. For moldmakers, getting molds built right the first time is critical to meeting these increasing demands. But how?

  • The Valve Gate Advantage

    Valve gate installations must be made to manufacturer specs to obtain the advantages necessary for competitive production of injection molded parts in today’s marketplace.

Related Topics

Resources